Currency KZT
Cleaning of septic tanks in manual order in Almaty
Order Cleaning of septic tanks in manual
Cleaning of septic tanks in manual
ochistka_septikov_v_ruchnuyu
ochistka_septikov_v_ruchnuyu
ochistka_septikov_v_ruchnuyu
ochistka_septikov_v_ruchnuyu
ochistka_septikov_v_ruchnuyu

Cleaning of septic tanks in manual

Price:
30000 KZT
Seller
Kazakhstan, Almaty
(View map)
Description

 

IP KROLL offers all types of sanitary works:

  1. Washing and clearing of sewer pipes (systems) with a cable and the hydrodynamic KROLL system under a high pressure of water to eliminate blockages of any complexity.
  2. Replacement of pipes, stoik etc.
  3. Installation and dismantle of shower cabins, toilet bowls, bidet, etc.
  4. Replacement and repair of cranes, sinks, etc.
  5. Laying of pipes of any diameter from And to I.
  6. Cleaning of septic tanks manually.
  7. Restoration of septic tanks, wells, drain holes.
  8. Installation of industrial zhiroulovitel.
  9. Video diagnostics of sewer system
  10. Services of the chimney sweep
  11. Welding works

We are glad to you to help at any time, we work without days off and holidays.

Elimination of a blockage quickly at any time convenient for you.

Hydrodynamic installations for cleaning of municipal and industrial pipes by means of the water moving under a high pressure allow to clear blockages of any complexity. Installation of a high pressure together with correctly picked up nozzles allows to fight against any kinds of pollution: with fatty traffic jams, leaves, silt, a scum, deposits of all types. The nozzle is the excellent choice for carrying out cleaning in sewer networks. Professional import installations and equipment for washing and clearing of blockages of pipes, sewerages, external, internal, storm. House, apartment, restaurant, cafe, production.

The master's call on the house and office by phone, payment on the place and the clearing settlement.

The hydrodynamic KROLL installation (MOLE) is a system for cleaning of municipal and industrial pipes by means of the water moving under a high pressure, it allows to clear blockages of any complexity. Installation of a high pressure together with correctly picked up nozzles allows to fight against any kinds of pollution: with fatty traffic jams, leaves, silt, a scum, deposits of all types. The nozzle is the excellent choice for carrying out cleaning in sewer networks, washings and clearings of blockages of pipes and the sewerage (external, internal, storm).

 

Hydrodynamics and hydrodynamic clearing of pipes

The main requirement of this method is the sewerage clearing when the specialized equipment is applied. Its main units – the powerful pump of a high pressure, armor hoses, various sets of the nozzles which are washing away or deleting all deposits in pipes. Usually the operator of installation the flushing hose and correctly picked up nozzle falls to a sewerage pipe. The powerful pressure of water and the arising jet draft, move a hose with a head on pipes forward. Productivity of the pump of a high pressure reaches 202 atmospheres which allow water to use the main force for washout of oozy rainfall from walls of pipes. After this stage the clearing of the sewerage is complete. Types and a variety of the applied nozzles can blow the mind. Our experts use "Kornerezka" at the roots which grew into pipes. At hit in a concrete pipe, "Mill" is applied. If ways are followed by any consolidations, then they are liquidated by "Bomb".

Mechanical, manual washing

This washing is used when there is a need for a clearing of pipes of small diameter. Also can be successful if access to a pipe is limited. Then experts use a metal cable which will remove the arisen blockages.

Qualified specialists of our company who are the best in Almaty will quickly and qualitatively render services – a clearing of the sewerage and sanitary services. We are completely prepared even for work during the winter period and we always cope with objectives.

Short description

IP KROLL renders services of any sanitary character in reasonable prices qualitatively and quickly. Conclusion of contracts for service. We work with 24/7. Guarantee. Call 87773453777 we Will agree! ! !

 

 

 

 

ABOUT FLUES

Owners of furnaces and fireplaces perfectly know about need of regular care of the heating coppers. Whatever perfect was the design, cleaning of a flue surely will be required. The speed of its contamination is influenced by different factors: service conditions, device design, quality and type of fuel, etc. However even in the most ideal conditions, at least once in a year, a flue it is necessary to clean. The IP KROLL company is glad to you to help at any time. Call, we will agree! ! !

 

 

LAYING OF PIPES

Installation of external sewer system, first of all begins with a construction of a trench which can be dug out a shovel manually or to use for this purpose the excavator. Depth of furrows will depend on depth of frost penetration in the earth in the concrete region.

But it is necessary to consider that laying of plastic pipes of the sewerage in the earth has to be carried out at least at distance of 0, 5 m from its surface. At application of pipes with a diameter of 110 mm, in the earth it is necessary to dig out deepening with a width of 60 cm and depth - depths of its bookmark are 5 cm more.

Features of a construction of a trench:

  • the bottom of a trench needs to be leveled so that the small bias, as a rule, on each running meter of a network of the pipeline it was created has to make 1 - 2 cm;
  • after the necessary bias is created, at the bottom it is necessary to execute careful ramming of soil and to build a pillow from sand or gravel about 10 - 15 cm high;
  • the gravel or sandy pillow needs to be condensed on a site which is for 2 m to a viewing well, and also in the place of joining of the pipeline with an entrance element;
  • in the location of bells, in sewer system it is necessary to create priyamk.

Further the direct construction of the pipeline follows. Laying of system of the sewerage in the earth needs to be begun from the base of a structure.

The technology of laying of plastic pipes of the sewerage looks as follows:

  1. Products keep within the prepared trenches a bell down.
  2. Before connection among themselves of pipes, the smooth end of one and a bell another need to be cleared of pollution.
  3. For simplification of connection and increase of its sealing, all junctions need to be greased with special structure.
  4. At connection of products it is necessary to watch that the pipe was inserted against the stop into a bell.
  5. All elements of the pipeline are similarly combined. That connection of products was qualitative and reliable, it is recommended to measure in the beginning depth on which the pipe will enter a bell, and on this place to put a mark. After that we insert a product until it "does not sit down" to the put mark.
  6. In need of the device of turns there are branches (15 °, 30 °, 45 ° and 90 °).
  7. If length of the sewer pipeline is more than 15 m, on such site it is necessary to establish audit.
  8. In the presence in the base of a structure of a conclusion, the bell of the pipeline is brought to it if such is not provided, then it is necessary to make an exhaust outlet. Diamond drills are ideally suited for this purpose.

On the end of laying of pipes it is necessary to double - check a bias corner. If everything is made truly, it is possible to start filling of a trench. It is for this purpose allowed to use the soil which was formed at excavation of furrows, but then it is necessary to remove from it big stones and to split dense blocks of soil.

The trench needs to be filled up gradually with layers on 5 cm, on height of 30 cm. Each layer has to be condensed well on both sides of a pipe, the place over a pipe is strictly forbidden to stamp.

Warming of plastic pipes

Need to carry out thermal insulation of plastic pipes arises at their laying higher than depth of frost penetration in the earth or at its exit from a structure. According to experts, in this case it is the best of all to apply a heater energofleks or stenofleks.

Sewer pipes are wound with heat - insulating material on all extent of the pipeline then it is reliably fixed, for this purpose it is possible to apply a self - adhesive aluminum tape. On the end of installation of insulating material, it is necessary to check correctness of a bias and only after that filling is made.

The best and correct option will be if to execute filling of the pipeline a sand layer (10 - 15 cm) which is densely stamped at the edges. Over it it is possible to fill up soil.

In need of carrying out partial repair of already functioning sewerage pipeline, it is more reliable and more correct to dismantle completely old sewer pipes then to make laying of new pipes. Actually, having made such decision, you will spend much less time, than will carry out replacement of separate sites of the sewerage.

By a method of work distinguish gravitational and mechanical a zhiroulovitel.

Street and underground zhiroulovitel. They are made of fibreglass and have the small weight, absolute tightness, and resistance to corrosion.

Zhiroulovitelya from the reinforced fibreglass represent the main building construction, are the engineering constructions maintaining loadings from pressure of soil and ground waters, mass of processing equipment. The materials applied at production – the reinforced fibreglass, stainless steel – do not give in to corrosion and rotting, having eliminated with that need of scheduled maintenance on anticorrosive protection of the case and providing long service life of constructions. Service life of working operation of a fiberglass zhiroulovitel not less than 50 years. Zhiroulovitel is issued ready to direct installation in system of the sewerage.

In rooms zhiroulovitel are made of stainless steel. Installation is mounted in close proximity to the place of mixing of MZhZ and flowing water. Dimensions of installation allow to make its installation in kitchen and production rooms, in technological space under a sink for washing of ware or near places of processing of food.

Installations of office of fat (zhiroulovitel) are intended for purification of household sewage of oil and fat pollution in places of the greatest concentration of such impurity. Installation is applicable in households and objects of industrial cooking, foodstuff where are used fat, oil of a vegetable and animal origin as means of prevention of blockages of a sewer network and ecological damage agrees: Construction Norms and Regulations 2. 04. 03 - 85 "Sewerage. External networks and constructions";

Principle of work of a zhiroulovitel

The principle of work of a zhiroulovitel is based on use of gravitational forces (a difference of specific density of oil, fat and water) and effect of "adhesion" of the particles of smaller density emerging on a water surface.

Waste water through an entrance branch pipe spontaneously comes to the first compartment where there is a partial subsidence of the weighed substances and emersion of zhiroprodukt on a surface. Then the lower sheet of water through a modulation spontaneously comes to the second compartment where there is an additional office of not emulsified fat. Then drains rise to the level of the letting - out collector and come to a sewer network or on further cleaning.

In coordination with the customer, installation of the sensor of control of the collected fat in the first compartment, and also the control and alarm automatic equipment informing on a contamination of pipes and accumulation of a sufficient butter layer and fat on a surface is provided in the zhiroulovitel.

Installation of a zhiroulovitel

Thickness of walls and their durability allows to make installation of a zhiroulovitel in soil, without additional concreting, previously having sprinkled with a layer of clean sand. At the same time it is necessary to consider the level of ground waters. If there is a probability of their presence in the place of installation, then the zhiroulovitel for emersion avoidance is required to prigruzhat. Specialists of our company will help to make calculation and will provide the scheme of a prigruz with the detailed description.

At the choice of a zhiroulovitel it is necessary to consider that for his correct work waste water has to settle certain time therefore it is impossible to apply to the set stream zhiroulovitel of smaller productivity, than settlement.

It is necessary to understand that indicators of quality of water at the exit from installation inevitably depend on indicators on an entrance. In case of emergencies, repeated increase in a stream of the sharp increase in maintenance of a giro products surpassing calculation, therefore, in waste water, indicators at the exit can temporarily differ from set.

The main objective of a zhiroulovitel – to purify waste production and household waters of various productions of fatty particles, and also vegetable and mineral oils. In addition it perfectly filters water from large pollution and different garbage, ensuring thereby effective functioning of system of the sewerage.

How the zhiroulovitel works?

The principle of its work is based on a gravitational method. Undesirable particles it is easier, than water therefore when water gets to a separation chamber, they separate from it and emerge upward, forming a film.

The waste gathering in the fat store should be deleted periodically. This process can be made as manually, and by means of automatic equipment, depending on device model. The quantity of fatty waste depends on the volume of the processed sewage, and also on type of the installation.
Are made by Zhirouloviteli of different materials. Are rather qualitative and convenient in operation of model with the case from polypropylene. They weigh a little, do not give in to corrosion and are durable. Usually in such devices there are plastic covers interfering distribution of unpleasant smells indoors where the zhiroulovitel is established.
Parameters of standard basic models of zhiroulovitel: productivity is from 0, 5 to 1, 5 m? /ч (0, 12 p/a – 0, 4 p/a) for devices under a sink and from 2, 0 to 30 m? /ч (0, 5 p/a – 10 p/a) for zhiroulovitel of shop type. Besides these settlement data for the necessary volume are used also this about density of the fat arriving with drains. Such comprehensive approach – guarantee of trouble - free and high - quality work of zhiroulovitel, and also absence of need for increase in the sizes of a construction.

Zhirouloviteli under a sink

Practically all zhiroulovitel under a sink have high efficiency of cleaning of drains of fatty and oil impurity – to 75% . For standard models productivity from 0, 5 is provided? to 1, 5? in hour Zhiroulovitel works by the gravitational principle: particles of fat and oils thanks to the small specific weight which is less than specific weight of water rise by a surface and are late in a separation chamber special plates. Being cleared of fatty impurity and large garbage, water passes two stages. In the beginning in the reception container there is a cleaning of the weighed particles, garbage, and also a small amount of fat. From the reception container drains get to a separation chamber where water is carefully purified of fat. After passing through a zhiroulovitel water goes down in the sewerage.
The most optimum material for zhiroulovitel under a sink – polypropylene. It does the device rather easy, provides durability and is not exposed to corrosion. Thanks to compactness of models it is easy to establish them under kitchen sinks. All zhiroulovitel have plastic covers which interfere with distribution in an unpleasant smell. Service of the device consists in systematic removal of the collected fatty waste. It is possible to do it manually and if characteristics of model – and automatically allow. Frequency of cleaning depends on the volume of sewage, and also on type of the most zhiroulavlivayushchy system.

Zhirouloviteli of shop type

Big zhiroulovitel of shop type usually establish in cellars or technical rooms. With their help clear drains from all enterprise or from some shops in which process food products. Productivity of such devices is much higher – from 2 m? in an hour (0, 5 p/a). To clean one zhiroulovitel quicker and more simply, than a little therefore at the enterprises zhiroulovitel of shop type prefer to establish. The principle of their work is also based on a gravitational method. The case is, as a rule, manufactured of polyethylene or polypropylene, providing to the equipment resistance to corrosion and durability (service life – till 30 years).
Zhirouloviteli happen rectangular and cylindrical. If there is no opportunity to put a zhiroulovitel on a surface, installation is made on the concreted platform or in a ditch. Efficiency of zhiroulovitel of shop type is quite high – they eliminate not less than a half of all fat which is contained in the arriving water. Service of devices consists in mechanical removal of fatty accumulation from grease collectors which equipped zhiroulovitel of shop type. If the volume of industrial drains big, cleaning of zhiroulovitel and utilization of fatty waste is made by means of the cesspool car.

Installation and service of zhiroulovitel

Adjusting works are usually performed on the following algorithm:
1. Zhiroulovitel is established on a plain firm surface.
2. The entrance branch pipe by means of a sewer pipe is connected to discharge of a sink or the route of the sewerage.
3. The output branch pipe by means of a sewer pipe connects to the place for discharge passed water purification in the sewerage.
4. For check of tightness of connections the zhiroulovitel is filled with water.
Zhiroulovitel under a sink can be established near a sink or under the jet washer, and, it is desirable so that he could be served rather easily. Zhiroulovitel of shop type establish where there is a possibility of its connection to the pipeline which is taking away drains. Usually it is technical rooms or cellars. If necessary the case of a zhiroulovitel can be buried. It is not necessary to reject the fact that the cesspool car can be necessary for pumping of fatty impurity.
Zhiroulovitel of shop type can be established outside the building. In this case it is necessary to take care of existence of a cover and good thermal insulation of the case.
The regularity of service of zhiroulovitel depends on the volume of the processed drains and on extent of pollution. After installation and start of its device it is necessary to examine every day regarding quality of work and to monitor the number of the fatty deposits which collected in it. Service of a zhiroulovitel at a distance of large garbage from a bottom of capacity and cleaning of a surface of a separation chamber of a fatty layer consists.

 

SEPTIC TANK

At the choice of the space at the dacha for a septic tank we consider the following:

  1. Possibility of an entrance to a septic tank on giving the tank pump for silt pumping. And though modern assenizatorsky cars can pump out contents from distance in 50 meters, for reliability the distance should not exceed 6 - 10 meters.
  2. As at septic tanks of DKS - 15 and DKS - 15M the possibility of pumping of contents is provided in a compost pit (by means of the fecal pump), according to sanitary and hygienic norms the septic tank has to be at distance of 5 and more meters from any well, a well or a reservoir (10 meters are better).
  3. The distance from a country house to a septic tank has to make from two to twenty meters. The optimum distance makes 3 - 6 meters.
  4. Normal the pipeline from a country house to a septic tank has to be laid in a straight line. If it is impossible, at its installation before the place of a bend it is necessary to establish an auditing pipe.
  5. We recommend to establish a septic tank a little lower than the level of a country house, and on a natural bias of the district – it is important for good outflow of sewage.

Digging of a ditch

Our instruction how to establish a septic tank, is based on a wealth of experience on installation therefore we recommend the following. Before beginning to dig a ditch at the dacha, acquire system of cleaning, a pipe to it and sand. Otherwise the dug ditch or two can be flooded per day with water or there will be a fall of its walls.

 

Installation of a septic tank in a ditch

Consider that ropes, polyfoam and sand will be necessary for installation of septic tanks.

We tie ropes to technological ledges of a septic tank on each side and we lower it in a ditch. For this purpose 4 persons will be necessary.

We level a septic tank on level – for this purpose we get up on its top part and we shake it, or it is possible to pour sand under a septic tank. The small bias towards the store – 1 cm by 1 m is resolved.

After installation and alignment of a septic tank we insert extenders of mouths and completely we fill all sections with water.

Attention! On the instruction it is not obligatory to attach a septic tank to a concrete plate in order to avoid expression on the Earth's surface since it anyway will not occur – the septic tank is constantly filled with water and has the special form.

From all directions we fill up a septic tank to a half with sand which then we spill water for filling consolidation.

Now at the edges of a septic tank and from above we stack polyfoam – the leaf 1х2 meters 5 cm thick for this purpose is required.

 

At the structure of sewer system on a country site many builders give preference to independent installation, without involving experts from outside and saving thereby money. Therefore it is often possible to hear a question — as the septic tank which is an obligatory component of such system to make with own hands.

For this purpose it is necessary to know types of septic tanks, ways of their installation, and also to have an idea from them it is better for them to use.

Earlier septic tanks represented accumulative capacities where sewer drains and sewage gathered. Utilization was made by assenizatorsky cars which took out these drains to specially established places.

Summer residents cleared small septic tanks by own efforts by means of a usual bucket. But at the same time all contents were transferred to the hole which is dug out nearby outside a site. About any sanitary standards conversation, naturally, was not carried on.

Modern septic tanks are a difficult system by means of which there was an opportunity to clear drains and sewage in the device. And to lower the purified water to the soil, without being afraid that it will do some harm to the nature.

The design of a septic tank is rather simple. In it such way of cleaning when heavy particles settle on a capacity bottom is used, and water passes into following. Here process repeats. And so occurs until water does not become the purest.

The heavy particles which fell by a bottom are affected by bacteria and are dissolved as a result of fermentation processes. Silt which can be used as fertilizer is formed. It is usually got from a capacity bottom when there is a need for cleaning a septic tank. And here the water which is already purified and clarified arrives on aeration fields where it is filtered through the top layers of earth.

By the way, the small particles which came with water decay under the influence of soil bacteria. Thus, sewer drains pass double cleaning. And, as show laboratory data, water is purified for 95% . Excellent result.

It is the simplest design explaining how the septic tank is arranged. And to make it with own hands very easily.

When scoping a septic tank it is necessary to take one standard indicator which is removed by practical consideration with additional calculation into account. This quantity of the drains falling on one person a day. This indicator is equal to 200 liters. One more condition — the volume of a septic tank has to maintain three - day norm of drains which are allocated by the house with all the inhabitants. That is, three indicators — 200 liters living three days and quantity undertake in attention.

Example. Small giving where there live three persons. The volume of a septic tank will be equal 200 * 3 * 3 = 1800 liters or 1, 8 cubic meters. That is, having established a septic tank from two reinforced concrete rings with a diameter of 1, 0 meter, it is possible to achieve effective work of sewer system.

By the way, there is a way more precisely. For this purpose it is necessary to take indications of the water counter which is installed on all water system as a basis. Add to it 20% , and the most exact volume will turn out.

Now, knowing septic tank volume, it is possible to calculate quietly its depth, width and length. By the way, they can be changed, increasing one dimensional indicator and reducing another. Therefore the choice of a method of its device depends only on you.

The self - made septic tank can be collected or constructed of a large amount of different materials. Here not material, but efficiency of operation of system, its durability and safety is important. All the rest is minor. And that to achieve it, it is required to observe precautionary measures, and also stages and nuances of construction.

Septic tanks can be made of reinforced concrete rings, of a brick or blocks, of metal capacities, for example, of barrels.

To construct a septic tank of their concrete rings, it is necessary to get these rings. Now producers offer a standard number of rings which correspond to the following dimensional indicators: diameter is 0, 7 - 2, 0 meters, height of 0, 8 - 0, 9 meters. To pick up rings under a certain volume of a septic tank, it is necessary to choose correctly them both on height, and on diameter.

Process of installation is very labor - consuming. It is impossible to lower rings in the hole prepared under them without attraction of special equipment. By the way, about hole depth. It should not be more than 4 meters. Therefore the volume of a septic tank is adjusted on diameter of the used rings. If you need bigger volume, then use installation from several wells.

So, combined wells need to be filled in with concrete solution, that is, to build a bottom. For this purpose the bottom of a hole is filled up with a sand layer, rammed, and then over it the crushed stone layer is added. Thickness of layers fluctuates in the range of 15 - 20 centimeters.

After that concrete solution prepares. It is filled in with preliminary installation on a framework bottom from metal fittings. After the bottom stiffens and will dry out, it is possible to start installation of rings.

After that it is necessary to seal seams. For this purpose it is possible to use water - repellent cement mortar. From outer side the well is processed by obmazochny waterproofing materials. By the way, it is possible to use hot bitumen.

And the last stage is an installation of a ready cover where the hatch and an opening under the air - channel is placed. After that filling of a gap between walls of a hole and a well is made.

The filtering well is constructed just on the same technology. The only difference is an installation under rings of the ready punched bottom. It can be got at the same plant where concrete rings are bought. Wells in a consecutive order by means of modulations connect. These are usual sewer plastic pipes.

 

Metal barrels were used at a construction of cesspools. They served long, did not demand big material and labor inputs, it was convenient to clean them so the septic tank from barrels the hands is a hot topic still.

You will need usual two hundred - liter metal barrels which will need to be welded by means of electric welding, establishing at each other.

As well as in the previous process, under a septic tank it is necessary to dig out a hole. Its bottom is surely concreted.

How built such septic tank earlier?

The lower barrel was put at first on a crushed - stone layer, processed hot bitumen from two parties and only after that filled in concrete. That is, the tight condition of one joint was provided completely.

Then on the first barrel put the second and fixed them among themselves welding. Sometimes added vertical metal crossing points, thereby doing fastening with higher quality. And so on to the last top capacity. After that surely carried out a waterproofing by means of paint, bitumen and other materials.

The filtering well from barrels did not demand a bottom construction therefore all this design was established on a crushed - stone layer. But at the same time edges of the lower barrel were surely concreted in the form of small a blind area from two parties.

Build a septic tank the hands from a brick was always considered as business long, labor - consuming and dirty. Cement mortar, a large number of time, plus the subsequent finishing of a bricklaying for ensuring tightness of a design for this purpose is required.

At first the necessary volume, then a capacity form was chosen, and the sizes were exposed. Further, as well as the previous options, the septic tank bottom was filled in. And only after its drying on it the laying was built. The indispensable condition is a waterproofing of a bottom. After the brick well was ready, its walls from two parties were plastered and processed by waterproofing material.

It was necessary only to close a well a cover for what used concrete, metal or wooden designs. The filtering septic tank was carried out on the same technology. The bottom was not filled in with concrete, but under a bricklaying the small tape base surely was located.

It is rather important question, especially if on a site there is a well or a well for a water intake. It is necessary to know precisely to what party on a site ground waters move.

The device it is possible to have near the house. For example, tight wells — at distance of 5 meters. An aerobic septic tank, to be exact to tell, its fields — are not closer than 30 meters from an open reservoir or 50 meters from a water intake source are not closer. Aeration fields cannot be placed near the bases at all.

It is important to find an optimal variant which will and consider sanitary and hygienic norms and to minimize expenses on transportation of drains and sewage from the house to a septic tank.

Diamond drilling

Diamond cutting, indisputable, the most highly effective and demanded technology in the modern construction world.
Diamond cutting is the fast, convenient, safe, and often, the purest method of production of openings and apertures.
Cutting application is one of the most widespread ways of cutting and expansion of door, window and arch openings today, and also apertures under engineering communications, nests for electric devices, air ducts of systems of ventilation, in walls from a monolith, concrete, reinforced concrete, a brick, granite, a natural and artificial stone, and also other construction materials.
Such popularity of application of diamond cutting has a variety of reasons, here some of them.

Diamond cutting allows to cut through an aperture of the exact size, without harm for surrounding objects, without noise and without dust. Even when cutting of strongly reinforced concrete ideally equal "ground" apertures of precisely required size which practically does not demand further finishing turn out, and can be used at once for designated purpose. There is no risk of peeling of fittings or concrete thanks to what the probability of damage of the important bearing design is excluded.
Lack of strong noise and dynamic shock influences allows to apply our technology in the houses which are in a stage of reconstruction and repair, and in some cases - even in already repaired inhabited apartments, under various household purposes, such as: ventilation, conditioning, heating and so forth.

Total absence of concrete dust during diamond cutting which is recognized as one of the most harmful substances for health of the person long ago does diamond cutting by the ecologically safest technology.


The most certain way of receiving the correct opening in concrete which precisely would correspond to a marking and did not demand the subsequent processing, application of technology of diamond drilling (drilling) of openings is.

At such approach to performance of work depth of an opening can reach 3 meters and more. Special extenders of diamond crowns are for this purpose used.

During drilling there is no dust and vibrations, and small noise level allows to perform works even in inhabited apartment houses, without creating problems for neighbors.

At diamond drilling cooling liquid is used, usually it is water which is pumped directly in a zone of work of a diamond crown via the engine.

Diameters of openings vary in such degree that they can be picked up for any purpose and a task.

Diamond drilling is used in different areas, for example:

  • For an input \ conclusion of telephone, power and other cables;
  • At installation of heating systems;
  • At the device of pipelines and ventilation.

Video - Diamond drilling under ventilation diameter is 300 mm

 

Area of application

Diamond drilling of concrete is ideal for performance of openings in u walls the bases (horizontal drilling), a so in perekrytuyakh u floors (vertical drilling). Diamond drilling of openings can be made under a corner, is close to a ceiling, a floor or a wall. Let's provide the incomplete list of the works performed by means of this technology:

  • Drilling of concrete, reinforced concrete, brick, stone;
  • Drilling of the exact openings which are not demanding additional processing;
  • Drilling of deep deafs and through openings;
  • Drilling of openings with a diameter from 5 mm, including drilling of big openings with a diameter up to 350 mm;
  • Drilling of openings in walls, overlappings, the base;
  • Drilling of openings for ventilation, pipes, openings under u wires channels;

Drilling of concrete for the aperture device in a wall, drilling of openings in u brick concrete for dismantle of walls, partitions of u of overlappings.

 

WELLS

There are several ways of washing of a water well with the hands.

Vibropump. If any the ordinary or special pump used at water pollution they can pump out garbage, silt, sand. For this purpose it is necessary to establish a pomp on a bottom of a well, and then all accumulated garbage will be soaked up by the pump.

Zhelonka. It is used at insignificant contaminations. The correct technology of washing of a well can be seen on video. Zhelonka is effective with a depth of well up to 30 meters.

Winch. It is possible to use at deeper blockages. It is considered more labor - consuming.

Fire truck. Within ten minutes by means of a fire hose and a pressure under strong pressure it is possible to clear a well. This way costs money and is unsafe: strong pressure can do much harm to knots of system and filters.

As the well is, in fact, the vessel filled with water, it is necessary to place a water lifting pipe in it. Compressed air will come to the lower part of this pipe by means of the air compressor.

Then in a pipe the air mixed with foam will turn out. Such water column will press on a water lifting pipe.

And as the lower part of a pipe is practically on sand, sand with water will be risen and included into a water lifting pipe.

 

If a well not too deep, then at its pollution as cleaning it is possible to use a zhelonka or the vibropump. At deeper well it is worth resorting to use of the mechanized cleaning.

Quickly to clear the hammered well – the sleeve of the fire truck is used. However such way expensive can also put some damages what one more type of material inputs follows from.

When a well – the only source of water, it is necessary to choose one of above - mentioned methods of a clearing of a well from time to time and to wash out it. Only in this case it is possible to avoid interruption in water supply which is very important in premises.

 

BIOSEPTIC TANKS

Life in a country house or on even has to be followed by a set of the conveniences comparable to the city apartment. Otherwise just there is no sense to change a well - planned living space for daily campaigns behind water and use of a rural toilet. One of the main components of well - planned housing is the system of the sewerage. In spite of the fact that the absolute majority of housing estates and country houses are not connected to systems of the main sewage disposal – this problem has the decision.

The modern industry offers a large number of modifications of autonomous sewer systems, to construct and serve which in a condition of people with the minimum technical skills. One of options of installation of such system is installation of a bioseptic tank.

Contact the seller
Cleaning of septic tanks in manual
Cleaning of septic tanks in manual
Compare0
ClearSelected items: 0