Currency KZT
Construction of facilities (HPP KZS Elevators MANAGER). buy in Kokshetau
Buy Construction of facilities (HPP KZS Elevators MANAGER).
Construction of facilities (HPP KZS Elevators MANAGER).

Construction of facilities (HPP KZS Elevators MANAGER).

In stock
Price:
8000000 KZT
Shipping:
Seller
Kazakhstan, Kokshetau
(View map)
+7(7 
Display phones
11
11 years on Allbiz
Description

Elevators

We project and we mount elevators of silage type from 1 000 to 500 000 tons.
Depending on needs of the customer design and construction of all infrastructure of object is carried out on the new platform, or the binding to the existing zernoochistitelny drying complexes is made, at the same time the uniform technological chain is developed.
Taking into account your requirements we at an initial stage of work will create three - dimensional model of your object. You will be able visually to see future object and to define optimum structure of the equipment.
We provide various technological lines including allowing to process and keep different cultures in one elevator complex!
Our elevators are supplied with monitoring systems of temperature and active aeration. Are equipped with completely automatic control system. It allows you to minimize expenses of work and loss of grain with preservation of its optimum food standards.
We build elevators taking into account a geographical arrangement of the region, wind, snow loading and seismic conditions.
We complete elevators with silos of own production.
It allows you to provide with the smallest losses and expenses reliable long storage of standard grain or temporary storage of damp grain with ventilation and cooling.

MANAGER and KZS

The engineering service "Voronezhselmash" carries out construction new and modernization of the existing the MANAGER, KZS and their modifications with installation of the modern processing equipment allowing to provide high efficiency and quality of cleaning and drying of grain.

Construction MANAGER and KZS "from scratch"
Journey height under bunkers to 3,5 meters for loading of cars with high boards.
Installation of the travel closed zavalny hole for frontal and lateral unloading of any cars as the hydraulic discharger, and from a platform (BP - 20, BP - 40, BP - 80).
Installation of the zernoochistitelny equipment for all stages of cleaning (primary, secondary, calibration) with a productivity from 25 t/hour (MPO - 50, SPO - 100, SVU - 60, etc. ).
Systems of a zernotransport with a productivity from 25 t/hour to 200 t/hour.
Installation of system of aspiration.
Installation of the power supply network and cases of management.
Adjustment of work of a complex on all operating modes.
Construction of the building the MANAGER is carried out on the prepared platform.

Reconstruction and modernization MANAGER and KZS
Reconstruction and modernization of the zernoochistitelny MANAGER unit and KZS ensures trouble - free operation of a complex and considerably cuts down your expenses on repair and service of equipment.
Reconstruction includes replacement of worn - out zernoochistitelny equipment on new, including repair of a metalwork and a roof, rise on the big height of a metalwork the MANAGER, KZS that allows to provide loading of transport of the bigger loading capacity (KAMAZ type).

As a result of reconstruction you receive:
The new pure and effectively working complex;
Increase in productivity of ZAV - 20 up to 50 t/hour, ZAV - 40 up to 100 t/h;
Increase in efficiency of cleaning after reconstruction;
Professional control and adjustment of the zernoochistitelny equipment;
Dismantle of the worn - out equipment;
Repair of cars and the equipment with wear to 50% ;
Replacement of the power supply network;
Installation of reduktorny drives and electroerection facilities;
Replacement of zernoprovod, valves, sectors, consolidations;
Repair of noriya and conveyors;
Restoration of zavalny holes;
Repair of a covering and cleaning of bunkers;
System recovery of aeration of bunkers;
Re - planning of places of loading and unloading;
Optimization of system of a zernotransport.

Seed plants

The technological lines of seed plants mounted by engineering service allow to achieve the minimum traumatizing seeds. Lines are designed in such a way that give the chance to minimize additional works.

The line for cleaning and preparation of seeds includes an intake, low - speed noriya and tape konveer, a separator of preliminary cleaning of SPO - 100 and a separator universal SVU - 60, a photoelectronic separator, and also capacities for temporary and long - term storage of seeds, packing shop and other auxiliary devices.

Contact the seller
Construction of facilities (HPP KZS Elevators MANAGER).
Construction of facilities (HPP KZS Elevators MANAGER).
Shipping method
Compare0
ClearSelected items: 0