Name of works |
Unit of measure | Cost (contractual) | ||
Installation of m/designs (work + truck crane) | ||||
Hot galvanizing | ||||
Installation of a wall and roofing professional flooring (cold building) | ||||
Installation of a wall and roofing professional flooring (the warmed building) | ||||
Installation sandwich of panels | ||||
Device of the bases (work + materials + equipment) | ||||
Constructional steel 0,8-4 mm thick with a length of contour up to 100 m | ||||
Constructional steel 0,8-4 mm thick with a length of contour from 100 to 500 m | ||||
Constructional steel 0,8-4 mm thick with a length of contour from 500 to 1000 m | ||||
Constructional steel 5-10 mm thick with a length of contour up to 100 m | ||||
Constructional steel 5-10 mm thick with a length of contour from 100 to 500 m | ||||
Constructional steel 5-10 mm thick with a length of contour from 500 to 1000 m | ||||
Constructional steel 12-200 mm thick with a length of contour up to 100 m | ||||
Constructional steel 12-20 mm thick with a length of contour from 100 to 500 m | ||||
Constructional steel 12-20 mm thick with a length of contour from 500 to 1000 m | ||||
Stainless steel 0,8-4 mm thick with a length of contour up to 100 m | ||||
Stainless steel 0,8-4 mm thick with a length of contour from 100 to 500 m | ||||
Stainless steel 0,8-4 mm thick with a length of contour from 500 to 1000 m | ||||
Stainless steel 5-10 mm thick with a length of contour up to 100 m | ||||
Stainless steel 5-10 mm thick with a length of contour from 100 to 500 m | ||||
Stainless steel 5-10 mm thick with a length of contour from 500 to 1000 m | ||||
Duralumin (AMTs, AMG) 1-4 mm thick with a length of contour up to 100 m | ||||
Duralumin (AMTs, AMG) 1-4 mm thick with a length of contour from 100 to 500 m | ||||
Duralumin (AMTs, AMG) 1-4 mm thick with a length of contour from 500 to 1000 m | ||||
Duralumin (AMTs, AMG) 5-10 mm thick with a length of contour up to 100 m | ||||
Duralumin (AMTs, AMG) 5-10 mm thick with a length of contour from 100 to 500 m | ||||
Duralumin (AMTs, AMG) 5-10 mm thick with a length of contour from 500 to 1000 m | ||||
Standard installation Split system from 2,6 to 5,5 kW | ||||
Standard installation Split system from 5,5 to 9,0 kW | ||||
Protective peak for conditioners from galvanized steel | ||||
Name | ||||
Protective peak for conditioners from the painted (white) galvanized steel | ||||
Protective protection (lattice) for the external block | ||||
Installation of a bar for an aperture which is wider than the external block (for installation of the external block) | ||||
Drainage pomp for a Split system with power up to 7,5 kW with installation (higher than the level of the internal block allows to place discharge of a drainage) | ||||
Power supply automatic machine with installation in an electroboard | ||||
Additional communications for a Split system | ||||
Departure of the climber for installation (dismantle) a Split system | ||||
Departure of the climber for other works, without crew | ||||
Departure of the climber for other works, with crew | ||||
Departure of the elevator (height is up to 3-4 floors), in 5 hours | ||||
Shtrob (deepening in a wall for laying of communications) in a brick | ||||
Shtrob in concrete | ||||
Additional box of 60х100 mm | ||||
Additional box of 15х18 mm or corrugation hose | ||||
Additional electrocable for the conditioner with installation | ||||
Additional electrocable for the conditioner with installation at the height more than 2,0 m | ||||
Punched hole of an additional opening under the main route in a partition from gypsum cardboard | ||||
Punched hole of an additional opening under the main route (a wall up to 80 cm thick) | ||||
Punched hole of an additional opening under the main route (a wall up to 80 cm thick), in the constrained conditions | ||||
Punched hole of an additional opening under the main route in a main wall at a thickness of wall over 80 cm, for each full or not full 10 cm | ||||
Punched hole of an additional opening under the main route in a main wall at a thickness of wall over 80 cm in the constrained conditions, for each full or not full 10 cm | ||||
Punched hole of an additional opening under an electrocable in a partition (concrete, a brick) or a main wall to 80 cm | ||||
Punched hole of an additional opening under an electrocable in a partition (concrete, a brick) or a main wall, in the constrained conditions | ||||
Punched hole of an additional opening under an electrocable in a main wall over 80 cm - the same, as an opening under the main route | ||||
Dismantle of the external block Split system | ||||
Dismantle of the internal block a Split system to 3,5 kW | ||||
Dismantle of a protective peak | ||||
Dismantle of the route | ||||
Water supply/heating pipes installation (software, SPE, Mpl) - d of 16-25 mm. | ||||
Water supply/heating pipes installation (software, SPE, Mpl) - d of 26-40 mm. | ||||
Name | ||||
Water supply/heating pipes installation (software, SPE, Mpl) - d of 50-63 mm. | ||||
Water supply/heating pipes installation (copper) - d of 12-18 mm. | ||||
Water supply/heating pipes installation (copper) - d of 22-35 mm. | ||||
Water supply/heating pipes installation (steel) - d of 15-32 mm. | ||||
Water supply/heating pipes installation (steel) - d of 40-50 mm. | ||||
Pipes of the sewerage internal installation of d to 110 mm. | ||||
Pipes of the sewerage external to d of 110 mm. installation | ||||
Pipes of the sewerage external over d of 110 mm. installation | ||||
Pipes of sewer d to 110 mm. laying in a trench with formation of a sandy pillow, vystavelniy a bias and thermal insulation | ||||
Thermal insulation pipes installation to d of 50 mm. | ||||
Thermal insulation pipes installation over d of 50 mm. | ||||
Pipes d of 110 mm. a raschekanka (cast iron on plastic) | ||||
Pipes d of 50 mm. a raschekanka (cast iron on plastic) | ||||
Dismantle of a window | ||||
Dismantle of a window sill | ||||
Dismantle, replacement of glasses | ||||
Removal of an old paint layer | ||||
Replacement of shtapik | ||||
Replacement of nashchelnik | ||||
Repair of window and door slopes | ||||
Filling, polishing | ||||
Installation of window blocks | ||||
Dismantle and replacement of accessories | ||||
Installation of new windows | ||||
Control of installation of new windows | ||||
8-10% of cost | ||||
Installation of blinds | ||||
Installation by a rolling shutter | ||||
10-12% of cost | ||||
Installation of window sills | ||||
Name | ||||
Plaster of window slopes | ||||
Laying of window openings from glass blocks | ||||
Sealing of seams | ||||
Device of window otliv | ||||
Coloring of window frames and lattices | ||||
Protective pasting of plastic window openings film | ||||
Filling, polishing, painting | ||||
Filling, gluing by a serpyanka and painting of a window slope | ||||
Coloring of a frame (1,6kh1,0m) | ||||
Coloring of fillings of window openings | ||||
Coloring of a frame (1,6kh1,0m) with a lattice | ||||
Coloring of frames of stained-glass windows (height and width are more than 2 m) | ||||
Installation of glasses | ||||
Showcase (5-6 mm) flew down; two-chamber double-glazed window | ||||
Showcase (5-6 mm) flew down; single-chamber double-glazed window | ||||
Showcase (5-6 mm) flew down | ||||
Usual (3-4 mm) flew down | ||||
Installation (installation) of dormer-windows | ||||
Installation of a dormer-window without installation of a roof | ||||
Installation of a dormer-window with the device of a power framework, without installation of a roof | ||||
Installation of a dormer-window with installation of a roof | ||||
Installation of a dormer-window with the device of a power framework and installation of a roof | ||||
Installation of a dormer-window with demontazhy and installation of a roof | ||||
Installation of a dormer-window with the device of a power framework, demontazhy and installation of a roof | ||||
Vapor barrier device | ||||
Waterproofing device | ||||
Installation of a heater | ||||
Installation of a roofing covering from a metal tile | ||||
Installation of a roofing covering from a natural tile and other types of a piece tile | ||||
The device of a soft rolled roof in 2 layers (without coupler) | ||||
Name | ||||
Installation of a roofing covering from different types of a soft tile | ||||
Installation of a roofing covering from wavy sheets | ||||
Installation of a roofing covering from Metro-Bond | ||||
Installation of a roof from a professional flooring | ||||
Section 4. Installation of doborny elements. | ||||
Installation of pediment eaves levels | ||||
Installation of a ridge element from a natural tile | ||||
Installation of a ridge and endovy element at the roof device from a metal tile | ||||
The device of a ridge element from a soft tile | ||||
The device of end at installation of a roof from a natural tile. | ||||
Installation of metal otliv | ||||
Installation of system of snow retention | ||||
Alignment of geometry of a roof | ||||
Installation of dormer-windows | ||||
The structure of channels through passage for flues | ||||
Device of the ventilating fad | ||||
Device of non-standard connections and adjunctions | ||||
Production and installation of the aero fad | ||||
Shtroba on a plaster plate | ||||
Shtroba on concrete | ||||
Shtroba on a brick | ||||
Shtrab under a cable | ||||
Shtrab under gofroshlang | ||||
Opening device | ||||
Installation of pipe PVC, corrugations | ||||
Installation of a metal tray | ||||
Laying of a wire | ||||
Device cable channel of flat | ||||
Laying of the power cable with a section from 6 to 25 mm2 | ||||
Laying of the power cable with a section from 35 to 75 mm2 | ||||
Name | ||||
Laying of a telephone wire | ||||
Laying of a television wire | ||||
Laying of radio of a wire | ||||
Installation of a switchboard | ||||
Installation of an electric case in a set | ||||
Installation of the automatic switch single-phase | ||||
Installation of the automatic switch three-phase | ||||
Installation of the electric meter single-phase | ||||
Installation of the electric meter three-phase | ||||
Installation of the device of protective shutdown | ||||
Installation of automatic machines of protection | ||||
Installation differential automatic machine | ||||
Replacement of the counter | ||||
Replacement of automatic machines of protection | ||||
Connection of the power line in a board | ||||
Installation of an electric point | ||||
Installation of electric lamps of a daylight | ||||
Installation of chandeliers, sconce | ||||
Installation of galogenovy lamps | ||||
Installation of the wall lamp | ||||
Installation of the built-in lamp | ||||
Installation of the suspended lamp | ||||
Installation of the regulator of lighting | ||||
Installation is ringing | ||||
Installation of the network socket on the electric stove | ||||
Connection of a water heater directly, without socket | ||||
Connection of the electric water heater | ||||
Installation and connection of a hand-drier | ||||
Installation and connection of the conditioner | ||||
Connection of the electric heated towel rail | ||||
Name | ||||
Installation of the fan (installation, connection) | ||||
Installation of television "crab" | ||||
Laying of a network cable for the computer | ||||
Testing of one piece of a cable for the computer | ||||
Installation of the socket of a computer network | ||||
Device of heat-insulated electric floors | ||||
Device of temporary lighting | ||||
Device of rafter part of a roof | ||||
Installation of an external obreshetka from boards | ||||
Installation of a kontrobreshyotka from a bar 50х50 | ||||
The device of an internal obreshyotka from boards | ||||
Installation of a step obreshyotka from a bar | ||||
The device of a continuous covering of a roof from plywood or other sheet covering | ||||
Fire-bioprotective processing of wooden designs of a roof | ||||
Installation of gypsum cardboard on walls | ||||
Gypsum cardboard in one layer on a metal framework with a cell of 600 mm | ||||
Gypsum cardboard in two layers on a metal framework with a cell of 400 mm | ||||
Gypsum cardboard in 1 layer on a metal framework with a cell of 600 mm and a noise isolation | ||||
Gypsum cardboard in two layers on a metal framework with a cell of 400 mm and a noise isolation | ||||
Installation of partitions from gypsum cardboard | ||||
Basic partition (a framework on 600 mm, height is up to 3 m, on one layer of gypsum cardboard from each party) | ||||
Basic partition (a framework on 600 mm, height is up to 3 m, on one layer of gypsum cardboard from each party with a noise isolation) | ||||
Two-layer partition (a framework on 600 mm, height to 3kh m, two layers of gypsum cardboard from each party) | ||||
Installation of ceilings from gypsum cardboard | ||||
The gypsum cardboard sheathed by one layer | ||||
Noise isolation (waterproofing, minvata, vapor barrier) | ||||
Second layer of the main ceiling | ||||
Assembly of a collector, adjusting knot | ||||
Installation of a hydraulic heat-insulated floor | ||||
Installation of a thermal valve for a heat-insulated floor | ||||
Name | ||||
Installation of collector group | ||||
Installation of the pump for a heat-insulated floor | ||||
Installation of flowmeters | ||||
Column a column for ladders, verandahs, arbors 100*100*2500 | ||||
Column a column for ladders, verandahs, arbors 100*100*2700 | ||||
Column a column for ladders, verandahs, arbors 100*100*3000 | ||||
Column a column for ladders, verandahs, besedok150*150*2700 | ||||
Rail-post 50*50*900 | ||||
Rail-post 60*60*900 | ||||
The rail-post is flat | ||||
The rail-post is round | ||||
Column initial 80*80*1200 | ||||
Column initial 100*100*1200 | ||||
Hand-rail for rail-posts 50*50 | ||||
Hand-rail for rail-posts 60*60 | ||||
The hand-rail is round | ||||
Podbalyasenik with a lath an insert | ||||
Podbalyasenik for flat rail-posts | ||||
Corner, turn, termination (snail) | ||||
Bowstring 50*300, lengths 2000/2500/3000/3500/4000/4500/5000 | ||||
Steps 40, shirina300, lengths 800/900/1000/1100/1200/1500/2000/2500/3000 | ||||
Podstupenok 18th width 200th length 800/900/1000/1100/1200/1500/2000/2500/3000 | ||||
Boards (platforms) 40th width 400/500/600 lengths 1200/1500/2000/2500/3000 | ||||
Boards (platforms) 40th width 1000/1200 lengths 1000/1200/2000 | ||||
Furniture board 18 width 300/600/1000, lengths 2500/3000 | ||||
Bar 80*80 length 3000/4000 | ||||
Bar 100*100 length 3000/4000 | ||||
Bar 150*150 length 3000/4000 | ||||
Installation of the announcer thermal | ||||
Installation of the announcer smoke | ||||
Name | ||||
Installation of the announcer manual | ||||
Installation of the announcer linear | ||||
Installation of the sound annunciator | ||||
Installation and installation of the PPK priyemo-control device | ||||
Commissioning of system of the fire alarm system | ||||
Installation and setting up the software on the computer | ||||
Installation of air ducts from steel at the height up to 3,5 meters | ||||
The same at the height over 3,5 meters | ||||
Installation of transitions, branches, semi-branches | ||||
Installation of tees | ||||
Installation of flexible air ducts | ||||
Installation of backpressure valves, throttle of valves | ||||
Installation of lattices to 400*400 | ||||
Installation of lattices to 1000*1000 | ||||
Installation of diffusers with a diameter from 100 to 400 mm | ||||
Installation of a noise suppressor with a diameter from 100 to 400 mm | ||||
Installation of a noise suppressor of rectangular section | ||||
Installation of the filter round | ||||
Installation of the filter rectangular | ||||
Installation of the electric heater | ||||
Installation of the water heater (without binding) | ||||
Binding of the water heater | ||||
Installation of the air gate | ||||
Installation of the drive of the air gate | ||||
Installation of the channel fan (round) | ||||
Installation of the channel fan (rectangular) | ||||
Installation of the roof fan | ||||
Installation of the radial fan | ||||
Installation of stitched installations with a productivity up to 300 m3/h | ||||
Installation of stitched installations with a productivity up to 700 m3/h | ||||
Name | ||||
Installation of stitched installations with a productivity up to 1500 m3/h | ||||
Installation of stitched installations with a productivity up to 2000 m3/h | ||||
Installation of the channel fan with a productivity from 100 to 500 m3/h | ||||
Installation of the fire-retardant valve with a covering | ||||
Isolation of air ducts penofoly | ||||
Isolation of air ducts mineral wool | ||||
Installation of an electrocable | ||||
Connection of power supply to the equipment of 220 V | ||||
Connection of power supply to the equipment of 380 V | ||||
Installation of the automatic machine | ||||
Installation of a board under automatic machines | ||||
Installation of an element of automatic equipment | ||||
Installation of a board of automatic equipment | ||||
Commissioning - a point | ||||
Commissioning - system | ||||
Dismantle of the existing system of ventilation | ||||