Currency KZT
Cyclone Central Bank-6 buy in Schuchinsk
Buy Cyclone Central Bank-6
Cyclone Central Bank-6

Cyclone Central Bank-6

In stock
Reconfirm the price with seller
Shipping:
Seller
Kazakhstan, Schuchinsk
(View map)
Technical characteristics
  • BrandЩКМЗ
  • Country of manufactureRussia
Description

Cyclone Central Bank-6

Boiler service equipment

The cyclone is intended for purification of combustion gases of ashes particles due to influence of forces of inertia at a rotary motion gas treacle.

1971 - the order of Minselstroy Kazakh the Soviet Socialist Republic it was decided to open Shchuchinsky mechanical-repair plant.

First of all entered repair of excavators and truck cranes, production of production for needs of rural builders, truboprokladchik, fuel trucks, bulldozers, plaster stations, the construction woods, standard sets the program of production. During work of plant studying and development of many other services which, first of all, workers of agriculture needed continued.

1989 - plant passed under management of the Ministry of heavy mechanical engineering of the USSR, was a part ON "Biyskenergomash" and was renamed into Shchuchinsky boiler and mechanical plant. By means of this the enterprise, largest in the Union, production of boilers in a brickwork envelope and a covering of the KE series and boilers - NR-23, KVTS, KVGM and others was put on a stream. Delivery of this production was made to all Federal republics.

1992 - plant was redeemed by collective and became the collective enterprise "Shchuchinsky Boiler and Mechanical Plant" with preservation of product range.

1998 - the owner of plant becomes Aziyaenergoproyektmontazh LLP.

On April 1, 1998 the plant is transformed to Shchuchinsky production branch Aziyaenergoproyektmontazh LLP.

January, 2013 - the old name of the enterprise came back. There was a reorganization by allocation from structure of Aziyaenergoproyektmontazh LLP of the independent enterprise Shchuchinsky Boiler and Mechanical Plant LLP.

Primary activity production of boilers from 1 to 25 t.para / hour and boilers from 0,01 to 100 Gcal/hour, boiler service equipment; water-pressure bashen; the preisolated pipes for heathighways; sandwich panels; metalwork.

Brand M3/hour productivity
CENTRAL BANK-6 3200


Contact the seller
Cyclone Central Bank-6
Cyclone Central Bank-6
Shipping method
Compare0
ClearSelected items: 0