Currency KZT
Design of the new enterprise order in Zheskazgan
Order Design of the new enterprise
Design of the new enterprise

Design of the new enterprise

Reconfirm the price with seller
Description
Design of the new enterprise
1 stage
Predesign inspection
1.1. Analysis of the product range.
1.2. The analysis of equipment, technology and the organization of production at the enterprise.
1.3. Development of offers and recommendations about improvement of the organization of production.
2 stage
The engineering design of the operating enterprise
2.1. Drawing up the specification for the conclusion of the contract for the engineering design.
2.2. Choice and justification of technology and equipment.
2.3. Project of sewing production with planning of workplaces.
2.4. Issue of requirements for labor protection and fire safety (illumination of workplaces, noise, microclimate, etc.).
2.5. Planning of number of workers.
2.6. Assessment and effective use of a floor space of sewing shop.
2.7. Definition and calculation of rational capacities of product lines of sewing shop for production of the main range of products.
2.8. Technical and economic indicators of production.
3 stage
Architectural supervision of introduction of the project
3.1. Observance of technology and organization of production.
3.2. Training of masters and technologists.
3.3. Assessment of results of introduction of the engineering design
4 stage
Organization of courses for professional development
Training of technologists and masters of sewing production directly at the enterprise
5 stage
Consultations
In addition — holding thematic seminars (the subject, cost, date and a venue of a seminar are coordinated by phone).
6 stage
Design of the new enterprise
6.1. Choice of specialization of the enterprise and its power.
6.2. Formation of structure of the enterprise.
6.3. Calculation of the main sites (workplaces, equipment and area).
6.4. The choice of equipment and equipment on sites of the enterprise.
6.5. Design of sewing shop.
6.6. Organizational planning solution of sewing shop and auxiliary sites.
6.7. Calculation of technical and economic indicators of sewing shop.
6.8. Formation of requirements to labor protection and fire safety
Contact the seller
Design of the new enterprise
Design of the new enterprise
We recommend to see
Compare0
ClearSelected items: 0