Currency KZT
Engineering hydrology order in Almaty
Order Engineering hydrology
Engineering hydrology
inzhenernaya_gidrologiya
inzhenernaya_gidrologiya
inzhenernaya_gidrologiya
inzhenernaya_gidrologiya
inzhenernaya_gidrologiya
inzhenernaya_gidrologiya
inzhenernaya_gidrologiya
inzhenernaya_gidrologiya

Engineering hydrology

Price from:
1000 KZT
Seller
Kazakhstan, Almaty
(View map)
Description
  1. Field engineering-hydrological works:

- reconnoitring inspection of beds of direct and periodic water currents, around their intersection with the route of the highway;

- partial reconnoitring inspection of reservoirs of direct and periodic water currents;

- definition of tags of the horizon of high waters (HHW) on waterways and poll of locals about the hydrological mode of a waterway with drawing up the relevant act;

- inspection of the existing artificial constructions (bridges, dams, etc.) is higher and lower than an alignment of the highway or the bridge crossing;

- leveling of a bias of a surface of the water of a waterway;

- breakdown and leveling of diameters (morfostvor) on characteristic sections of the rivers for design of bridge crossings;

- photoworks.

  1. Cameral inzhnerno-hydrological works.

- drawing up table of hydrological study of the area of works;

- determination of the areas of reservoirs of water currents, length and the weighted average bias of a bed of water currents to the closing alignments;

- definition of the maximum and minimum expenses of water of the rivers and temporary water currents using reducing formulas at insufficiency or lack of materials of hydrometeorological supervision;

- definition of the maximum and minimum expenses of water of the rivers in the presence of materials of hydrometeorological supervision, statistical processing of ranks of the maximum expenses and water levels.

- execution of hydraulic calculations on the basis of processing of diameters (morfostvor) and receiving the estimated horizons and speeds of water for bridge crossings.

- creation of estimated hydrographers of a drain of the rivers;

- calculations of the navigable horizons for large water currents;

- calculations of the maximum expenses of water from break of non-capital dams;

- calculations of height of a wind setup and height of a setup of a wave on embankment slopes;

- drawing up the scheme of a designed project with a binding of water objects.

Contact the seller
Engineering hydrology
Engineering hydrology
Compare0
ClearSelected items: 0