Installation of processing equipment, Chief installation of the high-voltage equipment, Balancing and commissioning, Installation and commissioning of the electrotechnical equipmen
Special works on the device of external and internal engineering networks and constructions including:
- devices of an external electric lighting, internal systems of an electric lighting and electroheating;
- lines and internal communication systems, radio-telecommunications and television.
Installation of processing equipment:
- cases of relay protection and automatic equipment;
- cases of high-frequency communication;
- boards of a direct current;
- boards of own needs of substation;
- complete distributing devices of 220/110/10 (6) kV;
- complete transformer substations;
- cells of average tension: KSO-292; K-104(108); YaKNO-6 (10); KRN-6 (10).
Chief installation of the high-voltage equipment:
- disconnectors of 35-500 kV of production of HAPAM and RUHRTAL (SIEMENS) firm, gas-insulated kolonkovy and tank switches of 35-500 kV (SIEMENS);
- measuring transformers of current and tension of TRENCH (SIEMENS) of 110-500 kV;
- limiters of an overstrain (OPN) of production SIEMENS;
- complete distributing devices with gas-insulated and air isolation on voltage of 6-35 kV;
- dry GEAFOL (SIEMENS) transformers of 6-10/0,4 kV.
Balancing and commissioning:
- cases of relay protection and automatic equipment;
- cases of high-frequency communication;
- cases of management of high-voltage lines, power transformers and transformers of tension;
- boards of a direct current;
- boards of own needs of substation;
- complete distributing devices of 220/110/10 (6) kV;
- complete transformer substations;
- cells of average tension: KSO-292; K-104(108); YaKNO-6 (10); KRN-6 (10).