Currency KZT
Installation of the operated P20 PIT puncture buy in Kostanaj
Buy Installation of the operated P20 PIT puncture
Installation of the operated P20 PIT puncture
18d043445d
bfb0bd0d4b
6ab4d0ccbb
81d5873644
737b889219
d9f07908c6
6822c7af9e
dbc7129a8d

Installation of the operated P20 PIT puncture

In stock
Price:
499000 KZT
Shipping:
Seller
Kazakhstan, Kostanaj
(View map)
Technical characteristics
  • BrandProff Partnersz
  • Country of manufactureKazakhstan
Description

Installation of the operated P20 PIT puncture

This model represents one of modifications of installations of the operated puncture. Installation of kotlovanny type from 20 by ton traction effort, two-line hydraulic system. Allows to lay communications at the length of 50-70 meters without deviation and an error as all process is controlled by system of an underground location. -

  • It is developed together with the German engineers of the KUNZE MACHINE GMB company

  • All hydraulic equipment of import production (Bulgaria, the Czech Republic, Italy) -

  •  - We completely modernized process of production of installation - now a frame and the bearing designs, are made with use of technology of high-precision laser cutting of metal - with the subsequent are flexible preparations of a frame. -


Characteristic

Value

Maximum expansion, mm

350

Maximum length of a puncture, m

50-70

Traction effort, t

20

Speed of movement of the carriage, m/s

0.2

Length of a bar, mm

650

Diameter of a bar, mm

50

Weight, kg

250

Dimensions (DKHSHKHV), mm

1200х500х480


Timbering -

For work from a priyamk the knot of a zadavlivaniye is completed with a timbering, - which - can easily be mounted directly in a priyamka.
 - - -

Inclined bed -

Installation allows - to work not only from a priyamk, and also from a surface - under different corners. For this purpose on zadavlivaniye knot - the bed which allows to set - a necessary corner for drilling is established. -
 - - -

Locational SNS system of 200 PROn

It is applied during the work on installation of the operated soil puncture. Will allow to reduce - puncture errors to a minimum and to keep the boring tool. -
 -
 -

Maslostantion

The facilitated maslostantion weight: 151 kg – full weight. Dry weight - 93 kg.
Dimensions: 680kh520kh1200mm
 -

 - -
Contact the seller
Installation of the operated P20 PIT puncture
Installation of the operated P20 PIT puncture
Shipping method
Compare0
ClearSelected items: 0