We determine the necessary drawing and quantity of a necessary tile by the sizes and flowers. To pull a cord without distortions on a tile facet. To lay out the first row on a cord. The tile should be put from itself on the prepared surface. It is necessary to stack on diagonal, to impose a new tile from above so that it densely adjoined to previous in order to avoid increase in thickness of seams. If the tile laid down unevenly, a trowel accurately to enclose under it sand and tamper carefully to level it again. After the end of laying it is necessary to level in places of obvious prevysheniye paving elements by means of the rubber hammer under construction level.
Having finished laying of all tiles, it is necessary for pro-revenge seams pescha-but-cement mix (1:10). From a hose with a spray to moisten sand-cement mix in gaps. After that if necessary strew in gaps still mix. In places of the increased humidity (for example, under drains from roofs) it is necessary to use dry sand-cement mix (3:1).
For giving to the platform of an exact geometrical form it is possible to establish a pedestrian border and to add incomplete sites with halves or tiles, zapilenny in a form. At the edges of the laid platform tile in installation sites of a border it is necessary to dig out a trench of the small size and the required depth on the tense cord (that the border entered this trench to necessary level). The top of a tile has to exceed border top on facet height. On liquid M100 solution to expose a border. On the tense cord it is obligatory to watch an exact adjunction to each other and repetition of geometrical forms. To spill boards of a border M100 solution and to fill with sand.
Important: When laying a tile it is necessary to hold a gap between a tile of 3-5 mm.
Ramming of a tile is made only on a dry surface. Before ramming seams are thoroughly checked and carefully recover, carefully ram the area by means of the ramming device with a rubber basis.