Roofing works (services)
Reconfirm the price with seller
Services of other enterprises
Description
Roofing works (services)
Name of works |
Unit of measure | Cost (contractual) | |
Installation of a smooth faltsevy roof on an unary fold | sq.m | ||
Installation of a smooth faltsevy roof on a double fold (manually) | sq.m | ||
Installation of a smooth faltsevy roof from rolled metal | sq.m | ||
Production and installation of stationary trenches (with filing to pictures on an unary fold) | item m. | ||
Production and installation of stationary trenches (with filing to pictures on a double fold) | item m. | ||
Production and installation of end at a bias more than 30% (with filing to pictures on an unary fold) | item m. | ||
Production and installation of end at a bias less than 30% (with filing to pictures on a double fold) | item m. | ||
Installation of rafter system | sq.m | ||
Antiseptirovany, antiperirovany wooden designs | sq.m | ||
The device of an obreshetka from a board | sq.m | ||
Waterproofing device | sq.m | ||
Laying of a heater (the general thickness is 20 cm) | sq.m | ||
Laying of a heater (the general thickness is 15 cm) | sq.m | ||
Vapor barrier device | sq.m | ||
Production and installation of aprons of an adjunction under an otter | item m. | ||
Production and installation of aprons of an adjunction with a shtrobirovaniye | item m. | ||
Dismantle of a protective protection | item m. | ||
Galvanization dismantle | sq.m. | ||
Dismantle of an obreshetka | sq.m. | ||
Small repair and covering of a protection primer | item m. | ||
Installation of a protective protection | item m. | ||
Installation of pro-spirits and flyugarok of subroofing ventilation | piece. | ||
Production and installation of a protective box of a pipe and vent. mines | sq.m (zagot.) | ||
Installation of umbrellas and caps on pipes (to 650х650) | piece. | ||
Installation of the ridge device for fastening of the safety equipment | item m. | ||
Assembly and dismantling of the stationary woods | m2fas | ||
Installation of a cap on a chimney pipe / vent. mine | piece. | ||
Insert vent. / sewer driving / antenna conclusion | piece. | ||
Installation of a cap on a column | piece. | ||
Installation of a dormer-window | piece. | ||
Name | Measurement unit. | ||
Insert of a dormer-window in a ready roof | piece. | ||
Installation of window eaves | rm. | ||
Filing of eaves sves rabbeted board | rm. | ||
Installation of garret ladders | rm. | ||
Repair of a simple roof with full replacement of the existing covering by a covering from sheet galvanized steel and partial (to 20%) replacement of an obreshetka | sq.m. | ||
Repair of a roof of average complexity with full replacement of the existing covering by a covering from sheet galvanized steel and partial (to 20%) replacement of an obreshetka | sq.m. | ||
Repair of a roof of average complexity with full replacement of the existing covering by a covering from rolled galvanized steel with fastening in a double fold and replacement of an obreshetka (to 20%) | sq.m. | ||
Laying of a metal tile, professional leaf, professional flooring | sq.m | ||
Euroslate laying | sq.m | ||
Installation of rafter system | sq.m | ||
Antiseptirovany, antiperirovany wooden designs | sq.m | ||
The device of a draft obreshetka from board/plywood | sq.m | ||
Installation of a kontrobreshetka | sq.m | ||
The device of a continuous obreshetka from whetstone (a step of 30 cm) | sq.m | ||
Waterproofing device | sq.m | ||
Laying of a heater (the general thickness is 20 cm) | sq.m | ||
Laying of a heater (the general thickness is 15 cm) | sq.m | ||
Vapor barrier device | sq.m | ||
Laying of the fad with a sealant | rm. | ||
Endova device | rm. | ||
The endova device with a slip | rm. | ||
Installation of an eaves level | rm. | ||
Installation of a pediment level (vetrovik) | rm. | ||
Device of adjunctions to walls | rm. | ||
Installation of a cap on a chimney pipe / vent. mine | piece. | ||
Insert vent. / sewer driving / antenna conclusion | piece. | ||
Installation of a cap on a column | piece. | ||
Installation of a weather vane | piece. | ||
Installation of a dormer-window | piece. | ||
Insert of a dormer-window in a ready roof | piece. | ||
Name | Measurement unit. | ||
Filing of pediment carrying out by a spotlights or siding | rm. | ||
Installation of window eaves | rm. | ||
Filing of eaves sves rabbeted board | rm. | ||
Installation of garret ladders | rm. | ||
Opening of air and water bubbles, removal of moisture, drying of the opened places | sq.m. | ||
Repair of a roof in 1 layer, including partial opening of an old roofing carpet (to 20%) | sq.m. | ||
Repair of a roof in 2 layers, including partial opening of an old roofing carpet (to 20%) | sq.m. | ||
Repair of a roof in 2 layers, including full removal of an old roofing carpet and repair of a coupler by places (to 20%) | sq.m. | ||
Roof paving in 2 layers on the ready basis | sq.m. | ||
Roof paving in 2 layers with production of not reinforced cement and sand coupler 50 mm thick | sq.m. | ||
The roof device in 2 layers with production of the reinforced cement and sand coupler 50 mm thick, warming of minplity PPZh-200 150 mm thick and 2-layer vapor barrier | sq.m. | ||
Roof paving in 2 layers with production of the reinforced cement and sand coupler 50 mm thick, warming of minplity PPZh-200 150 mm thick, 2-layer vapor barrier, the razuklonka device from expanded clay with an average thickness of 100 mm | sq.m. | ||
Full dismantling of the existing roof (a waterproofing covering, a coupler, a heater) with garbage removal | sq.m. | ||
The device of a two-layer roofing carpet the built-up rolled material on a vertical surface | sq.m | ||
The thermal insulation device from plates 150 mm thick | sq.m | ||
Device of a cement and sand coupler up to 50 mm thick | sq.m | ||
The device of the reinforced cement and sand coupler up to 50 mm thick | sq.m | ||
Ogruntovka of the basis primer | sq.m | ||
The razuklonka device from expanded clay with an average thickness of 100 mm | sq.m | ||
The device of vapor barrier of the built-up single-layer | sq.m | ||
Vapor barrier device dry | sq.m | ||
Installation of water waste funnels | piece | ||
Installation of aerators roofing, deflectors | piece | ||
Parapet up to 500 mm wide paving galvanized steel | m | ||
The apron device from galvanized steel on adjunctions of a roofing carpet to vertical surfaces | m | ||
Laying of a flexible tile (Katepal, Tegola, etc.) | sq.m | ||
Laying of a natural tile | sq.m | ||
Installation of a copper tile | sq.m | ||
Installation of rafter system | sq.m | ||
Antiseptirovany, antiperirovany wooden designs | sq.m | ||
Name | Measurement unit. | ||
The device of an obreshetka from board/plywood | sq.m | ||
Installation of a kontrobreshetka | sq.m | ||
The device of a continuous obreshetka from whetstone (a step of 30 cm) | sq.m | ||
Waterproofing device | sq.m | ||
Laying of a heater (the general thickness is 20 cm) | sq.m | ||
Laying of a heater (the general thickness is 15 cm) | sq.m | ||
Vapor barrier device | sq.m | ||
Laying of the fad | rm. | ||
Endova device | rm. | ||
Installation of an eaves level | rm. | ||
Installation of a pediment level (vetrovik) | rm. | ||
Device of adjunctions to walls (pipes) | rm. | ||
Device of an additional waterproofing | sq.m | ||
Device of the ridge aerator | piece. | ||
Device of the wall aerator | piece. | ||
Installation of the aerator | piece. | ||
Installation of a snegozaderzhatel | rm. | ||
Installation of water waste aprons | rm. | ||
Installation of a gutter | rm. | ||
Installation of drainpipes | rm. | ||
Device of the built-in gutter | rm. | ||
Installation of a dormer-window | piece. | ||
Insert of a dormer-window in a ready roof with a basalt covering | piece. | ||
Insert of a dormer-window in a ready roof with a copper covering | piece. | ||
Installation of a cap on a chimney pipe / an air shaft | piece. | ||
Installation of a cap on a tower | piece. | ||
Installation of an aeration cap on a tower | piece. | ||
Installation of a weather vane | piece. | ||
Installation of window eaves | rm. | ||
Filing of eaves sves rabbeted board | rm. | ||
Name | Measurement unit. | ||
Installation of garret ladders | rm. | ||
Roof waterproofing a membrane Krovlelol And in 1 layer | sq.m | ||
The vapor barrier device - 1 layer of isolayer | sq.m | ||
The thermal insulation device from plates of Penopleks of P-35 100 mm thick | sq.m | ||
The thermal insulation device from expanded clay thickness on average 150 mm | sq.m | ||
Laying of a road grid | sq.m | ||
The device of the leveling coupler 40 mm thick | sq.m | ||
Laying of geotextiles of TERAM density is 90 g/m2 | sq.m | ||
Laying of geotextiles of TERAM density is 90 g/m2 | sq.m | ||
Device of a protective coupler 30 mm thick | sq.m | ||
The device of monolithic can the plate reinforced by 2 grids of 4 VRI-100/100 10 cm thick | sq.m | ||
Filling dry cement and sand mix - 40 mm | sq.m | ||
Laying of paving slabs gray | sq.m | ||