Timbering folding mobile OP-1.5
In stock
Reconfirm the price with seller
- Customer pickup,
- Courier
- In detail
Products of other enterprises
Description
The timbering folding mobile OP-1,5 is intended for work on laying new and replacement of old pipelines with the subsequent installation of reinforced concrete rings.
Diameter of the ring (max) of 1,5 m mounted by can
Belt height:
- subsequent 0,8 m
Effort of rise (max) of 300 kN
Installation of reinforced concrete rings is made in a timbering. Raising of a timbering is carried out by two hydraulic cylinders with an opiraniye of a power beam on a reinforced concrete ring. In process of promotion of a timbering emptiness between a ring are formed and a timbering are filled with bulk soil. After that installation of the following ring is made. Further the cycle is repeated.
Contact the seller
Timbering folding mobile OP-1.5

We recommend to see