Currency KZT
Turbogenerators with the opened ventilation cycle - for work as a part of gas-turbine power plants buy in Aksaj
Buy Turbogenerators with the opened ventilation cycle - for work as a part of gas-turbine power plants
Turbogenerators with the opened ventilation cycle - for work as a part of gas-turbine power plants

Turbogenerators with the opened ventilation cycle - for work as a part of gas-turbine power plants

In stock
Reconfirm the price with seller
Shipping:
Seller
Kazakhstan, Aksaj
(View map)
Products of other enterprises
Description

1.2. Turbogenerators with the opened ventilation cycle

Are intended for work as a part of gas-turbine power plants.

Turbogenerators of type of shopping mall have case execution on two panel board bearings of sliding with use of circulating greasing of bearings. Turbogenerators like GTG are executed on stoyakovy bearings of sliding, and the 2,5 and 4 MW GTG with the independent lubrication system.

Turbogenerators are executed in the closed execution with self-ventilation on the opened cycle, can be completed with the block of aircleaning and recirculation of air.

Turbogenerator type Power, Tension, In Frequency of rotation, rpm efficiency, % Weight, kg
kW kVA
TK-1, 5-2RUHLZ 1500 1825 6300 10500 3000 95,8 7600
TK-2,5-2RUHLZ 2500 3125 6300 10500 3000 96,8 96,7 10000
TK-4-2RUHLZ 4000 5000 6300 10500 3000 97,2 97,0 13000
TK-6-2RUZ 6000 7500 6300 10500 3000 97,4 18000 20040
T-6-2PT3.1 6000 7500 6300 10500 3000 97,3 16000 16743
GTG-2,5-2RUHLZ 2500 3125 6300 10500 3000 96,8 96,7 14500 15150
GTG-4-2RUHLZ 4000 5000 6300 10500 3000 97,2 97,0 17050 15000
GTG-6-2RUHLZ 6000 7500 6300 10500 3000 97,5 20500
GTG-8-2RUHLZ 8000 10000 6300 10500 3000 97,5 29000

The design of turbogenerators is protected by the certificate No. 29188 on useful model. Certificates of conformity No. POCC RU. MX02. N 00208 on shopping mall - 6 - 2 RUZ, No. POCC RU. MX02. N 00207 on shopping mall - 2,5 - 2 P UHLZ, POCC RU. MX02. N 00106 on GTG - 2,5 - 2 P UHLZ and GTG - 4 - 2 P UHLZ.

Contact the seller
Turbogenerators with the opened ventilation cycle - for work as a part of gas-turbine power plants
Turbogenerators with the opened ventilation cycle - for work as a part of gas-turbine power plants
We recommend to see
Shipping method
Compare0
ClearSelected items: 0