The getting waterproofing. Obmazochny waterproofing. A cellar waterproofing at a construction stage. Water exudes through a floor.
Decision 1: at strong, waterproof concrete of the basis it is necessary to open cracks and cracks shtraby with a section of 2Х3 cm, to proshtrabit adjunctions to walls, to wash out AVD. Then to fuller repair structure for seams Doctor Beton B122.
Decision 2: at "weak" concrete of the basis, strong cracking filling of a floor by the new concrete prepared with use of an additive Doctor Beton - E131 is recommended.
Need of observance of technology.
At use of dry mixes for production of a waterproofing it is necessary to observe technology strictly. It includes thorough training of a surface, the correct preparation of solutions, the correct care of materials after drawing.
Services of other enterprises
Description
Contact the seller
Waterproofing of all
We recommend to see